Boundary Wall Construction Begins
Work has begun on constructing a 1.8m high wall around the perimeter of the site. This project is long awaited and needed, but other projects needed for the children have always come first.
Finally we are in a position to begin work.
The work is expected to take around 6 weeks.
![Boundary Wall Construction Begins](https://www.stmarystrust.org/wp-content/uploads/2019/02/Boundary-Wall-Construction-Begins.jpg)
![Boundary Wall Construction Begins](https://www.stmarystrust.org/wp-content/uploads/2019/02/Boundary-Wall-Construction-Begins1.jpg)
![Boundary Wall Construction Begins](https://www.stmarystrust.org/wp-content/uploads/2019/02/Boundary-Wall-Construction-Begins2.jpg)