Refurbishment of Boarding Home
During the past 12 years general maintenance of the school has always taken place, but the shower areas, the floors, the walls and windows all needed upgrading. The children had no private area for their belongings and lockers have been installed for all the children. Mesh and railings have been installed along balcony areas for the safety of the children, who have been known to jump into nearby trees to reclaim balls they have lost in transit after classes, and an extra staircase has been added for entrance to the girl’s dormitory.
With the help of all our supporters and Trustees the necessary improvements have now been made to the building. Take a look at some of the pictures below: